L1/S 150

The blockwork is built tight against inner face of the steel lintel. Place mortar bed on top of blockwork before floor units are laid to provide even distribution of load. Steel Lintels may be propped to facilitate speed of construction.

Damp Proofing

Provide a damp prood course over all lintels.
For more guidance please contact our technical team here.

 

SKU: L1/S 150 Categories: ,

Description

For Cavity widths 150-165mm

Length (mm) Height
(mm)
Thickness
(mm)
Total UDL
kN 3:1
Total UDL
kN 19:1
600
1500
100 2.0 16 13
1650
1800
118 2.0 22 18
1950
2100
130 2.0 21 17
2250
2700
148 2.5 25 20
2850
3000
173 2.9 27 22
3150
4000
173 3.2 26 19
4200
4800
199 3.2 25 20