L5/XHD 110 | IG Lintels

L5/XHD 110

Place mortar bed on top of blockwork before floor units are laid to provide even distribution of load. Steel Lintels may be propped to facilitate speed of construction.

Damp Proofing

Provide a damp prood course over all lintels.
For more guidance please contact our technical team here.

 

SKU: XCFSK110 Categories: ,

Description

L5/XHD 110: For Cavity widths 110-125mm

Length (mm) Height

(mm)
Thickness
Inner
Thickness
Outer
Total UDL
kN 19:1
600
1800
235 5.0 2.9 100
1950
2400
235 5.0 2.9 90
2550
3000
235 5.0 2.9 80
3150
3600
235 5.0 3.2 65
3750
4800
235 5.0 3.2 50