L6/130 WOL | IG Lintels

L6/130 WOL

Place mortar bed on top of blockwork before floor units are laid to provide even distribution of load. Steel Lintels may be propped to facilitate speed of construction.

 

SKU: XK130WOL Categories: ,

Description

For Cavity widths 130-145mm

Length (mm) End Bearing Total UDL kN 19:1
600
4800
200 80
1950
2400
235 5.0
5200 200 70
5400 200 62
5800 200 55
6200 200 45
6600 200 40